본문 바로가기 주메뉴 바로가기

Company

Company History

Dongyang, who is not afraid of change with the belief that only the courageous can get ahead, leads the sandwich panel market.
With the development of new products, we are creating a new wave of change in the field of building materials.

1987 ~ 1999

1987

  • 11. Dongyang Panel Industry Co., Ltd. established; CEO: Lee Gun-il & Kwon Oh-bong
    (capital: 270 million KRW / business type: manufacturing / business items: heat resistant panels, structural metal plates)

1989

  • 12. Obtained license for metal construction works (license number: gyeonggi-89-11-7) business type added: manufacturing, construction

1990

  • 08.Acquired land for the first factory; location: 17-21, Sangsu-ri, Nam-myeon, Yangju-gun, Gyeonggi-do (4,799m2)
  • 11. Capital increased (paid-in capital after increase: 540 million KRW)
  • 12. Started construction of the first factory

1991

  • 06. Completed construction of the first factory (E.P.S. sandwich panels) (2,072.80m2)

1992

  • 05. Capital increased (paid-in capital after increase: 1 billion KRW)
  • 11. Capital increased (paid-in capital after increase: 1.4 billion KRW)

1994

  • 01. Sold license for metal construction works (license number: gyeonggi-89-11-7)
  • 08. Capital increased (paid-in capital after increase: 2.4 billion KRW)
  • 12. Contracted to purchase the first line of urethane panel machines (Contimat 30 by Hennecke in Germany) Second class of trading business registered / business type: manufacturing, wholesale / business items: import and export of heat resistant panels, structural metal plates

1995

  • 02. Completed construction of factory office and dormitory buildings (648m2)
  • 03. Acquired land for the second factory / location: areas including 17-2, Sangsu-ri, Nam-myeon, Yangju-gun, Gyeonggi-do (9,623m2)
  • 07. Capital increased (paid-in capital after increase: 3.2 billion KRW)
  • 11. Completed construction of the second factory (urethane panels) (2,474.16m2)
  • 12. Designated to use skilled industrial personnel

1996

  • 04. Completed construction of the first urethane panel production line (Contimat 30 by Hennecke in Germany)
  • 10. Capital increased (paid-in capital after increase: 4 billion KRW)
  • 11. Obtained KS certification for urethane panels (wall- and roof-type)

1997

  • 02.Obtained KS certification for E.P.S sandwich panels (wall- and roof-type)

1998

  • 12. Contracted to purchase the second line of urethane panel machines (Contimat 20 by Hennecke in Germany

1999

  • 12. Completed construction of the second urethane panel production line (Contimat 20 by Hennecke in Germany)

2000 ~ 2014

2000

  • 07.Contracted to purchase the first line of glass wool & rock wool sandwich panel machines (by ROBOR in Italy)

2001

  • 09. Completed construction of the first glass wool & rock wool sandwich panel production line

2003

  • 01. Contracted to purchase the second line of glass wool & rock wool sandwich panel machines (by ROBOR in Italy)
  • 05. Investment in Dongyang Panel Industry Co., Ltd. Establishment of Dongyang Industry Co., Ltd. (Paid-in capital: KRW 1.8 billion)
  • 06. Dongyang Industrial Co., Ltd. Acquired factory site 180-2, Munbang-ri, Inju-myeon, Asan-si, Chungcheongnam-do (47,696M2)
  • 08. Completed construction of the second glass wool & rock wool sandwich panel production line
  • 09. Capital increase of Dongyang Industry Co., Ltd. (Pay-in capital of KRW 3.8 billion after capital increase)
  • 11. Completed construction of the third glass wool & rock wool sandwich panel production line

2004

  • 01. Awarded as a model taxpayer (National Tax Service)
  • 06. Started construction of Dongyang Industrial Co., Ltd. factory building extension

2005

  • 05. Completion of extension of Dongyang Industrial Co., Ltd. factory building (8,529.34M2)

2006

  • 06. Capital increase of Dongyang Industrial Co., Ltd. (Paid-in capital of KRW 6 billion after capital increase)

2008

  • 04. Dongyang Industrial Co., Ltd. POLY-METAL production line completed
  • 11. Steel material for construction (wall and roof) Glass wool 30 minutes, 1 hour fire-resistance structure acquisition

2009

  • 05. Dongyang Industrial Co., Ltd. 1st and 2nd units Glass wool & Rock wool Sandwich Panel production line completed

2010

  • 10. Capital increase of Dongyang Industry Co., Ltd. (Paid-in capital of KRW 6.6 billion after capital increase)

2014

  • 02. Developed heat resistant structures for metal material (125T wall-type) glass wool that can stand for 1 hour

2016

  • 04. Plus panel patent application (Application No. 10-2014-0090285)
  • 11. Diamond panel design registration (Application No. 30-2016-0021806)

2021

  • 01. Brick pattern design registration (Application No. 30-2020-0020651)
  • 11. Steel material for construction (roof 150T) Glass wool 30 minutes fire-resistance structure acquisition
    Steel material for construction (outer wall boltless 125T) Glass wool 1 hour fire-resistance structure acquisition